Fast to sample, fast to change over, stable on reorder.

Sampling normally takes 1–3 days, and inquiries are answered the same working day. We deliberately do not publish a fixed mass-production lead time: decoration combinations and blank sources vary too much between projects, so we quote a schedule per order. Daily capacity is 200,000 pcs / day, scheduled and tracked by our in-house system.

From inquiry to shipment

The seven steps, and the two gates that matter

Deep processing rarely fails in production. It fails because the first article was never properly approved. So we build two mandatory approval points into the process and archive their results, which is also what makes reorders reproducible.

  • STEP 01
    Requirement review
    Bottle type, capacity, decoration combination, quantity, target market and required delivery date.
  • STEP 02
    Process assessment & quotation
    We quote against your target margin. Cost, freight and incidentals are broken out line by line, and multiple scenarios can be supplied.
  • STEP 03
    Sampling
    Physical samples for complex or shaped bottles; colour matched to your Pantone reference; multi-colour film prepared in-house. Colour results are archived.
  • STEP 04
    First-article approval — mandatory
    Mass production only starts after you approve the first piece. Its parameters are recorded in the system.
  • STEP 05
    Scheduling & production
    Automatic scheduling. Operators scan a card to pull the work order; machine and operator data is captured live. Changeover takes about 30 minutes.
  • STEP 06
    In-process sampling (continuous)
    Sampling records are bound to the batch inside the same system.
  • STEP 07
    Shipment & tracking
    Customers follow order progress and inspect production quality in real time through our mini-app.
What moves the date

Factors that change lead time

These are the variables that actually decide whether a promised date holds — and each one can be settled at quotation stage rather than discovered during scheduling.

Lead-time variables — exact dates confirmed at scheduling
VariableEffectControllable
Blank sourceStocked general-purpose blanks are fastest; customer-supplied blanks depend on your arrival date; a new bespoke mould needs separate lead timeStock: yes
Number of processesPrinting + stamping + firing stack up both handling and curing timeAssessable upfront
Colour and filmNon-standard colours or complex artwork need matching and film preparationConfirmable upfront
First-article approval speedWaiting time at approval counts toward total lead timeJoint
Shaped or faceted bottlesTooling setup takes longer, though registration stability is our strengthAssessable upfront
Order sizeMass orders and reorders are scheduled differently; reorders move faster because parameters are already archivedPlannable